FAQ — Tile and Flooring Sarasota

Frequently Asked Questions

Honest answers about tile installation, flooring, cost, timelines, and working with Cullinan. If you do not find what you need, call us directly.

(689) 346-0800

Cost and Pricing

How much does tile installation cost in Sarasota?

Installed cost typically ranges from $5 to $45 per sq ft depending on tile type and complexity. Standard ceramic floor tile runs $5 to $13 per sq ft. Walls run $7 to $30 per sq ft. Marble and large format slabs run $20 to $45 per sq ft. We provide itemized quotes with no hidden fees.

Is your quote free?

Yes. Free on-site estimate with no obligation. Same-day response, walkthrough within 48 hours.

Do you charge for travel within Sarasota County?

No. Sarasota, Bradenton, Lakewood Ranch, Venice, and surrounding areas are all within our standard service area. No travel fees.

What is included in your price?

Labor, substrate prep, waterproofing where applicable, setting materials, grout, and cleanup. Always itemized — no surprises.

Materials and Tile Types

What is the best tile for a Florida bathroom?

Porcelain. Dense, moisture-resistant, handles humidity well. We advise based on your design and budget.

Porcelain vs ceramic — what is the difference?

Porcelain is denser and less porous. Better for wet areas and outdoor use. Ceramic is lighter, ideal for walls and light-traffic areas.

Do you supply tile or do I buy it myself?

Both work. Many clients buy from a showroom and we install. We can also source through our supplier network.

Can you install large format tiles (24×48 and larger)?

Yes. Large format slab installation is one of our specialties. We have the specific equipment required — vacuum lifters, precision leveling systems, extended rail cutters.

Do you work with marble and travertine?

Yes. We install marble, travertine, slate, quartzite, and other natural stone with correct adhesives, grout, and sealing.

Timeline and Process

How long does bathroom tile installation take?

Standard shower or floor takes 2 to 4 days. Full remodels take 5 to 10 days. Realistic timeline given upfront and we stick to it.

How long does floor tile installation take?

A 400 to 600 sq ft area takes 2 to 3 days including prep and grout cure time.

How quickly can you start?

We respond the same day. On-site walkthrough within 48 hours. In general we start within 2 days after contract closing, depending on scope and current schedule.

For Builders and Contractors

Do you work on new construction?

Yes. We offer quotes within 48 hours, schedule discipline, and overflow capacity for builders managing multiple units.

What makes Cullinan different as a flooring sub?

We show up when we say we will. Clean site. Proactive communication. No punch-list issues. That is what builders pay us for.

Do you have overflow capacity for urgent projects?

Yes. Call Fernando directly at (689) 346-0800.

Still have questions?

Call Fernando directly or submit your project and we will respond today.